Grizzly Insulation insulates and seals brewery buildings in Denver and the surrounding metro: brewhouse roofs and walls where steam condenses, cellar and cold-room envelopes, and the walls between production and your taproom. We walk the building, then send a written scope and estimate planned around your brew days.

No obligation. Tell us the rooms and the problem; we reply within 24 hours to set up the walk-through.

Stainless brewing tanks under an insulated brewery ceiling

Brew sheetWhere is the building letting you down?

Tick one to jump to it. It is also noted on your estimate request.

100% Guarantee

We make it right

150 + Projects

Insulation jobs done

Around brew days

Non-brew days and nights

Tanks covered

Before any spray or cutting

Trusted products

Products and partners we work with

Brewery insulation services

What you can hire Grizzly Insulation to do in your brewery

Pick the work closest to what you need. Every request goes to the same team, and you can change your choice in the form.

Brewhouse roof and wall insulation

If you are seeingDrips, frost or stains on the roof deck over the brewhouse.

We check the roof deck, walls and seals, then insulate and seal them so steam meets a warmer surface, with a washable finish where it gets wet.

Cellar and fermentation room insulation

If you are seeingA cellar that fights summer heat and room cooling that runs long.

We insulate and air-seal the room’s roof and walls to cut heat gain through the building. Tank temperature stays with your glycol system.

Built-in-place cold rooms

If you are planningA keg cooler or cold room built inside the building.

We insulate and vapor-seal built-in-place cold room walls and ceilings. Prefab panels and refrigeration come from your refrigeration contractor.

Taproom sound-control insulation

If you are hearingThe brewhouse, kegs and pumps from the taproom.

Sound insulation in shared walls and above the ceiling, with the gaps sound travels through sealed. It makes the room quieter, not soundproof.

Brewery build-out and expansion

If you are planningA move into an older building, or more space next to production.

We plan and install shell insulation before tanks and finishes block access, and phase work next to rooms that keep brewing.

Wet or damaged insulation replacement

If you are seeingSagging, soaked or moldy insulation over production rooms.

We remove it and install insulation suited to how wet the room runs, after any roof leak has been fixed by your roofer.

Glycol and process piping, tank jackets, prefab cooler panels, ventilation and CO2 monitoring belong to other trades. See where our scope stops.

Where our scope stops

What a brewery insulation contractor does

A brewery insulation contractor works on the building: roof, walls, ceilings and the rooms you brew, store and pour in. The brewing system has its own specialists. We handle the building scope and coordinate the interfaces with your project team.

Grizzly InsulationThe building

  • Roof deck and wall insulation over the brewhouse and cellar
  • Washable, sealed finishes in wet rooms
  • Built-in-place cold room walls and ceilings
  • Sound insulation between production and taproom
  • Air and vapor sealing at seams and penetrations
  • Removal of wet or moldy insulation

Other tradesThe brewing system

  • Glycol line and process pipe insulationMechanical insulation contractor
  • Tank jackets and tank insulationTank maker
  • Prefab walk-in cooler panelsRefrigeration contractor
  • Ventilation, CO2 monitors and exhaustHVAC contractor
  • Kettle vapor stacks and condensersBrewhouse supplier
  • Grain dust collectionDust collection supplier

The short answer

How to insulate a brewery

Split the building by what each room does. Over the brewhouse, insulate and seal the roof deck so steam cannot condense on cold metal, and finish it with a washable surface. Insulate the cellar and cold rooms so they hold temperature through summer. Put sound insulation between production and the taproom, keep the mill room sealed and free of dust ledges, and tell your HVAC contractor how tight the rooms will be.

  1. Brewhouse

    Sealed roof deck and washable finish against steam.

  2. Cellar

    Insulated to hold fermentation temperatures.

  3. Cold rooms

    Tight, vapor-sealed walls and ceilings.

  4. Taproom

    Sound and comfort next to production.

  5. Mill room

    Sealed, smooth, no dust ledges.

Why Grizzly Insulation

Why brewery owners hire Grizzly Insulation

A local crew based in Commerce City, just north of Denver, that works on the building, says plainly what is and is not insulation work, and plans around production.

100% Guarantee

If something we installed is not right, we make it right.

150+ projects

Insulation projects completed across all building types.

Fully insured

Certificates of insurance available for your landlord or builder.

Reply within 24 hours

Every estimate request gets a reply within a day.

You send the request

Rooms, problem and location. A few short fields.

We walk the brewery

On a non-brew day or a time you choose.

You get a written scope

Areas, materials, finishes and line-item pricing.

We install and hand back

On the agreed schedule, then walk it with you.

Brewhouse steam

How much water your boil puts into the air

Every boil drives off water. A vapor stack or condenser sends most of it outside, but whatever escapes ends up as humid brewhouse air, and on a cold Denver winter day it condenses on the roof deck and drips back down. Enter your own numbers.

10 bbl
6% per hour
60 min
3

Uses 31 gallons to the barrel. Your boil-off rate is on your brew sheets.

Water boiled off per brew

18.6gal

Per week
55.8 gal
Per year
2,902 gal

Each mark is one brew this week

Honest part: getting steam out is the brewhouse supplier’s and HVAC contractor’s job. Our job is making sure the steam that does linger meets a roof and walls warm and sealed enough that it does not condense and rain back on your brewhouse. This shows water boiled off, not how much stays in the room or which insulation you need; the walk-through answers that. Barrel definition: 27 CFR 25.11.

Grain to glass

Brewery insulation, room by room from grain to glass

Follow the beer through the building. Each stop puts a different load on the walls and roof. Tap a stop.

Mill room

What it does to the building

Fine grain dust that settles on every ledge, facing and purlin.

What we install

Insulation behind smooth, sealed, cleanable surfaces with no exposed facings or dust ledges.

Also bring in

Dust collection supplier, and your fire marshal on NFPA 61.

Condensation

Stopping drips over the brewhouse

Brewhouse drips often come from condensation rather than a roof leak, though the two can look the same. Warm, wet air from boils and cleaning rises, touches a roof deck or wall colder than its dew point, and turns back into water. We check which it is on the walk-through; for condensation, the fix is a warmer, sealed surface the air cannot reach behind.

01

Seal to the deck

Closed-cell spray foam or a sealed assembly against the roof deck, so humid air never touches cold metal.

02

Close the penetrations

Vapor stacks, flues, pipes and conduit all pass through the roof and walls. Each one is sealed all the way around.

Insulated walls and ceiling in a brewery production room
Illustrative photo
03

Finish you can wash

Foam covered with an approved coating or a washable liner panel, so cleaning does not soak the insulation.

04

Old insulation out

Wet, sagging or moldy insulation over a brewhouse comes out before new goes in.

Cellar and fermentation

Holding cellar temperature through summer and winter

Your glycol system controls the tanks. The room around them still matters: heat that gets through the roof and walls on a hot Denver summer afternoon, with strong high-altitude sun on the roof, becomes load on the room cooling, and cold snaps in winter do the opposite. Slide the outside temperature to see which way the heat flows.

95°F
65°F

Heat is flowing into the cellar

It is 30°F warmer outside. Every degree of that difference pushes heat through the roof and walls, and the room cooling has to take it back out. More insulation means less heat gets in.

Fermentation CO2

CO2, tighter rooms and who watches the air

Fermentation releases carbon dioxide, which is heavier than air and collects in low spots. When we insulate and seal a cellar, the room gets tighter, so ventilation and CO2 monitoring have to be designed for that by your HVAC contractor before the work starts.

  1. 1

    Our part

    Seal the cellar for temperature and moisture, and tell you and your HVAC contractor exactly how tight it will be before we start.

  2. 2

    Your HVAC contractor's part

    Ventilation, low-level exhaust where CO2 settles, and fixed CO2 monitors with alarms.

  3. 3

    Your part

    Keep monitors maintained and tested, and make sure the crew knows what an alarm means.

Ventilation and monitoring design is not insulation work; we coordinate how tight the room will be with the people who design them.

Taproom

Taproom noise and comfort next to production

Guests like seeing the tanks. They like hearing the keg washer, pumps and forklifts a lot less. Insulation in the shared walls and ceiling cuts the noise and keeps the taproom comfortable while the brewhouse runs hot and wet next door.

Sound goes straight through an empty stud wall and over the top of walls that stop at the ceiling.

Illustrative

  • Shared wallsSound batts or mineral wool in the stud cavities between production and the taproom.
  • Above the ceilingNoise travels over the top of walls that stop at the ceiling. We insulate and seal that path too.
  • ComfortInsulated exterior walls and roof over the taproom keep guests comfortable in summer and winter.
  • Honest limitInsulation reduces noise. It does not make a room soundproof, and glass walls into the brewery still let sound through.

Grain and mill room

Mill room dust and the surfaces around it

Milled grain makes fine dust. NFPA 61 covers fire and dust explosion prevention in agricultural and food processing facilities, and your fire marshal decides how it applies to your mill. In Denver that review sits with the Denver Fire Department under the Denver Fire Code. On our side, the walls and ceiling should not give that dust anywhere to settle.

Avoid

Exposed facings and ledges

Loose blanket facings, open purlins and fuzzy surfaces collect dust where nobody cleans.

Use

Smooth, sealed, covered

Insulation behind smooth, cleanable surfaces, with gaps and penetrations sealed so dust stays in the room.

Other trades

Dust collection

Capturing dust at the mill and conveyors is your dust collection supplier's job, set with your fire marshal.

See NFPA 61.

Every size of brewery

Brewpub, production craft or regional brewery

A brewpub and a packaging-heavy production brewery have different buildings and different problems. Pick the one closest to yours.

Production craft brewery

A warehouse-style building with a brewhouse, a cellar of fermenters, a cold room and usually a taproom.

  • Roof deck insulation over brewhouse and cellar
  • Washable, sealed finishes in wet rooms
  • Cold room walls and ceilings
  • Taproom sound and comfort

Build-outs

Building a brewery inside an older building

Plenty of Denver-area breweries move into old warehouses, garages and industrial buildings. In Denver, insulation in a build-out is permitted and inspected under the Denver Energy Code. Getting the insulation plan right before the tanks arrive is far easier than working around them later.

Insulated room being built inside an older warehouse for a brewery
Illustrative photo
  1. 1
    Walk the shell earlyRoof deck, walls, old insulation and any water stains, before the layout is final.
  2. 2
    Mark wet and dry zonesBrewhouse and cellar get moisture-proof details. Office and taproom can be standard.
  3. 3
    Insulate before tanksRoof and high walls are easiest to reach while the floor is empty.
    Tanks arrive after this
  4. 4
    Seal for the HVAC designTightness agreed with your HVAC contractor, CO2 and exhaust included.
  5. 5
    Inspect before finishesSeals and penetrations checked before liners and coatings go on.

Planning the work

Working around brew days and open tanks

Beer does not wait for contractors. Before we start, the scope sets the work windows, what needs clearing, covering or pausing, and how each area goes back into use.

  • Work windows agreed firstNon-brew days, nights or areas away from the brewhouse, written into the scope.
  • Cover and protectTanks, kettles, packaging lines and taps covered before spraying or cutting.
  • Nothing near open productNo spraying near open fermenters or anything being cleaned for use.
  • Clean as we goDebris bagged and removed, floors cleaned before your crew gets back.
  • Return to use per the productSpray foam and coatings follow the manufacturer's re-entry and ventilation instructions in the plan.
  • Hand backYou walk the area with us before it goes back into use.

Cost

What drives brewery insulation cost

The number depends on which rooms you need done, how wet they run and how much equipment is already in place. These are the things that move it, and the brewery brief that gets you an accurate estimate faster.

  • Rooms and areaBrewhouse, cellar, cold room, taproom and roof area.
  • Wet room detailsSealed assemblies and washable finishes.
  • AccessWorking over and around tanks already in place.
  • RemovalWet or moldy insulation out first.
  • Sound workWalls and ceilings between production and taproom.
  • ScheduleNon-brew days, nights or before opening.
Your brewery brief 0 of 6 ready

Tick what you can share. It goes with your request, and you can remove it there.

What your estimate lists

We do not publish per-square-foot prices for Denver breweries, because access, wet-room finishes and removal change the number. Your estimate is built from the walk-through.

Service area

Serving Denver breweries from Commerce City

Grizzly Insulation is a brewery insulation contractor based at 7140 Ivy St in Commerce City, just north of Denver, working on brewpubs, production craft breweries and brewery build-outs across Denver and the surrounding metro.

Map of our Commerce City base, north of DenverThe map loads from Google Maps only when you ask for it.
Grizzly Insulation Co.7140 Ivy St Unit B, Commerce City, CO 80022Mon–Sat 8 AM–5 PM · Sun by appointment
Directions

Approximate straight-line distance from our Commerce City base. Tap a city for its commercial insulation page.

Questions

Denver brewery insulation FAQs

Yes. An accurate estimate needs the walk-through: we measure the areas, check existing insulation, seals and access around tanks, then send a written scope letter with line-item pricing. The walk-through is free and set around your brew days.

The brewery’s city or ZIP, which rooms are affected, a sentence on what you are seeing and your rough timing. Photos, a layout or your brew schedule help but are optional.

Yes. Choose Builder or GC in the form and tell us who the owner is. We work to the drawings and coordinate with the refrigeration, HVAC and mechanical contractors on the job.

We reply within 24 hours to confirm the details and set a walk-through time. Sending a request does not commit you to anything.

We are based in Commerce City, just north of Denver, and serve Denver and the surrounding metro. Enter the brewery’s ZIP in the form or the service area check and we will confirm the location with you.

A brewery insulation contractor like Grizzly Insulation insulates and seals the building: roof decks and walls over the brewhouse and cellar, built-in-place cold rooms, wet-room finishes and sound insulation between production and the taproom. Glycol lines, tank jackets, prefab walk-in panels, ventilation and CO2 monitors are handled by other trades.

Steam from boils and cleaning rises and meets a roof deck that is colder than its dew point, then condenses and drips. Insulation sealed tight to the deck keeps that surface warm and keeps humid air off the cold metal. Vapor stacks and exhaust that remove the steam come from your brewhouse supplier and HVAC contractor.

Closed-cell spray foam or a sealed insulated assembly, covered by an approved coating or washable liner panel. It should not soak up water, and the finish has to stand up to hoses and cleaning.

Yes. Your glycol system controls the tanks, but the room still gains heat through the roof and walls in summer. Insulating and sealing the cellar cuts that heat, so the room cooling works less to hold its set point.

It can be, as long as ventilation and CO2 monitoring are designed for it by your HVAC contractor. Fermentation releases CO2, which is heavier than air and collects low. We tell you and your HVAC contractor how tight the room will be before we start.

We can reduce noise from production with sound batts in shared walls and above the ceiling, and by sealing the gaps sound travels through. Insulation reduces noise; it does not make a room soundproof, and glass walls still let sound through.

No. Glycol and process pipe insulation is done by mechanical insulation contractors, and tank insulation comes from the tank maker. We insulate the building and rooms around them.

Yes. We plan work for non-brew days or areas away from the brewhouse, cover tanks, kettles and packaging lines, keep spray away from open fermenters and clean up before your crew is back.

Denver winters are cold and dry while a brewhouse runs hot and wet, so the roof deck and outer walls are where steam condenses. Closed-cell spray foam or a sealed insulated assembly tight to the deck keeps humid air off cold metal, and the same insulation cuts summer heat from strong high-altitude sun on the cellar roof. The walk-through confirms the system room by room.

It may. Energize Denver covers Denver commercial buildings of 5,000 sq ft and up, and covered buildings benchmark their energy use every year; you can look your building up in the Energize Denver tool. A build-out or major alteration is permitted and inspected under the Denver Energy Code, and we install to the insulation values on your permit set.

Brewery insulation cost depends on which rooms are included, wet room details and finishes, working around tanks already in place, removal of wet insulation, sound work for the taproom and your schedule. We price it from a free walk-through with an itemized scope letter.

Prefer to just ask?

Call and talk to the crew that will actually be on your roof deck.

Get started

A brewery building that keeps up with brew day

Request a free estimate for your Denver brewery. We walk the building on a non-brew day and send a scope letter room by room, with materials, finishes and line-item pricing.

1

You send the form

A few short fields. We reply within 24 hours.

2

We walk the brewery

Brewhouse roof, cellar, cold room and taproom, around your brew schedule.

3

You get a scope letter

Room by room, with materials and line-item pricing. No pressure, no upsells.

(303) 854-6221

Mon–Sat 8 AM–5 PM · Sun by appointment

info@grizzlyinsulationco.com

We reply within 24 hours

7140 Ivy St Unit B

Commerce City, CO 80022

Talk to a Brewery Insulation Contractor

A few short fields. We reply within 24 hours.

No pressure, no upsellsReply within 24 hours100% guarantee