Home/Commercial Insulation/Factory Insulation
Commercial insulation · Denver, Colorado
Factory Insulation Contractor in Denver
Grizzly Insulation insulates and air-seals older Denver-area factories: roofs timed with a reroof, masonry walls after a check, and old insulation out first, whether the building keeps making things or becomes offices or lofts. As with all our commercial insulation services in Denver, we walk the building first, then send a written scope and estimate.
- Free walk-through and written scope letter
- Testing results before anything comes down
- Insulation only, no asbestos abatement
No obligation. Tell us about the building and your plans; we reply within 24 hours to set up the walk-through.

Est.1925
1890194019701988Today
Before 1940
- Usually built with
- Solid brick walls, often several bricks thick
- We check first
- Asbestos in pipe wrap, boiler rooms and old roofing
100% Guarantee
We make it right
150+ Projects
Insulation jobs done
Fully Insured
COI on request
Free Scope Letter
Order of work and line items
Trusted products
Products and partners we work with






Factory insulation services
What you can hire Grizzly Insulation to do in your factory
Pick the work closest to what you need. Every request goes to the same team, and you can change your choice in the form.
Brick, block and concrete wall insulation
If you are seeingCold, drafty masonry walls that make the floor hard to heat.
After a masonry check, we insulate the inside face with spray foam or rigid board and air-seal windows, sills and edges. Where the brick is not ready, we say so and start with the roof. Our spray foam insulation in Denver also air-seals the wall as it goes on.
Roof insulation timed with a reroof
If you are planningA roof replacement in the next few years.
We plan insulation above the deck with your roofer at reroof, or insulate from below now where the deck and ceiling height allow.
Old insulation removal
If you are seeingWet, oily, soiled or failing insulation in the walls or overhead.
Once testing is clear, we remove non-asbestos insulation and install the new system. Regulated material goes to a certified abatement contractor.
Condensation and damp wall control
If you are seeingDamp walls, drips or condensation on cold surfaces.
We check where the moisture comes from, then insulate and air-seal so warm indoor air stays off cold surfaces. Gutters, roof leaks and masonry repairs come first, from other trades.
Factory conversion insulation
If you are planningTurning the building into offices, studios, lofts or a venue.
We plan the insulation with your architect to suit the new use, the energy code and any fire and sound rules between units. Our guide to fire-resistant insulation shows which types are non-combustible.
Asbestos and lead testing and abatement, masonry repair, roofing, windows and HVAC belong to other trades. See who does what before work starts.
The short answer
How to insulate an older factory building
Test first, because older factories can hold asbestos and lead paint. Once it clears, old insulation comes out; our insulation removal in Denver service shows how that is done without spreading dust. Then read the walls, pick the roof approach by deck and timing, and only then insulate and finish to code.
- 1
Step 1
Test
Asbestos and lead checks on anything we will disturb, done by certified inspectors.
How testing works - 2
Step 2
Read the walls
Brick, block or concrete, and how wet they get, decides the wall method.
Compare wall types - 3
Step 3
Plan the roof
Wood plank, concrete or metal deck, and how many years the roof has left.
Roof timing - 4
Step 4
Insulate and finish
Insulation, air sealing and a code-ready finish for how the space will be used.
Finish by planned use
Why Grizzly Insulation
Why factory owners hire Grizzly Insulation
A local crew based in Commerce City, just north of Denver, that works on the building, waits for test results before anything comes down, and says plainly what insulation can and cannot do for old masonry.
100% Guarantee
If something we installed is not right, we make it right.
150+ projects
Insulation projects completed across all building types.
Fully insured
Certificates of insurance available for your landlord or builder.
Reply within 24 hours
Every estimate request gets a reply within a day.
You send the request
Building, problem and location. A few short fields.
We walk the factory
With you and your design team, at a time that suits you.
You get a written scope
Areas, materials, finishes and line-item pricing.
We install and hand back
On the agreed schedule, then walk it with you.
Factory decoder
What your factory's age tells us
The year a factory went up says a lot about how it was built and what might be hiding in it. Pick an era for the usual construction, the first things we check and the insulation options that tend to fit.
Oldest at the bottom, like most factories that grew over the decades
Usually built with
- Solid brick walls, often several bricks thick
- Wood plank or heavy timber roof decks
- Big steel or wood windows, sawtooth or monitor roofs
- Additions from later decades
We check first
- Asbestos in pipe wrap, boiler rooms and old roofing
- Lead paint on steel, sash and trim
- Brick and mortar condition, and where water hits the walls
- Rot or old leaks in the roof deck
Insulation that tends to fit
- Roof insulation above the deck when the roof is replaced
- Interior wall insulation only after a masonry check
- Air sealing at windows, sills and roof edges
- Old insulation removed first
General patterns, not a survey of your building. Many factories were added to over the decades, so one building can have several eras in it.
Walls
Insulating brick, block and concrete factory walls
Old masonry walls dry by letting heat pass through them. Insulate the inside and the outer brick gets colder and wetter, which can cause freeze-thaw damage, a real risk with Denver’s many swings above and below freezing. So the wall type, its condition and how much rain it takes decide the method.
Solid brickInsulationFramingFinishRain exposure
Interior insulation, after a masonry check
Closed-cell spray foam or rigid board tight to the brick, then a stud wall and a finish. Foam tight to the masonry helps keep warm indoor air off the cold brick. Thickness is chosen with the freeze-thaw risk in mind.
Watch for Brick that takes a lot of rain, failing mortar, missing gutters and embedded steel. These get fixed or assessed before the wall is closed in.
Roofs and glass
Sawtooth roofs, old decks and factory windows
Older factories were built for daylight, with sawtooth and monitor roofs and steel windows worth keeping. The insulation plan works around that light and is timed with the roof, which in Denver faces strong summer sun and winter snow.
Wood plank decks
Common in the oldest buildings. Insulation usually goes above the deck when the roof is replaced, so the old timber stays warm and dry. Insulating under a wood deck needs a moisture check first.
Concrete decks
Heavy and durable. Rigid insulation above the deck at reroof is the usual route. From below, spray foam or board is possible where the ceiling height allows.
Metal decks
Found in later additions. Closed-cell spray foam or a liner system from below, or rigid insulation above at reroof.
Sawtooth glass and steel windows
Insulation cannot fix single glazing. We insulate and seal the frames, curbs and walls around the glass, and leave the window choice to your design team.
Roof due soon?
Due nowAbout 1025+
Plan it with the reroof
With only a few years left, insulation above the deck at reroof is often the better value. Replacing a roof that has insulation above the deck generally means bringing that insulation up to current values under the 2021 IECC.
General guidance from this page, not a roof assessment. Your city's adopted code edition decides, and we look at both routes on the walk-through.
Test first
Asbestos, lead and old insulation: test before anything comes down
Older factories often have asbestos in pipe wrap, roofing, flooring or old insulation, and lead in paint. In Colorado, commercial renovation that disturbs more than the trigger amounts needs an inspection by a state-certified asbestos building inspector first.
- 1InspectionA Colorado-certified asbestos building inspector samples what the job will disturb.Inspector
- 2Abatement if neededRegulated material is removed by a certified abatement contractor, with state notice.Abatement firm
- 3Old insulation outGrizzly Insulation removes clean, non-asbestos insulation that is wet, oily, soiled or failing.Grizzly Insulation
- 4New insulation inOnly then does the new system go up.Grizzly Insulation
Sample bagColorado trigger levels
Public and commercial buildings, Regulation 8 Part B
- 260linear ft of pipe
- 160sq ft of other surfaces
- 55gallon drum volume
Quick check against these amounts
Enter rough amounts to compare them with the trigger levels.
A quick comparison with the trigger amounts on this page, not a determination. Buildings put up after 12 Oct 1988 may qualify for an exception with the right documentation. See CDPHE asbestos guidance. We do not do asbestos abatement; we work alongside the firms that do.
New use
Converting a factory: what changes for insulation
A factory that becomes offices, lofts or a brewery follows different rules than one that keeps making things, as many RiNo and Globeville buildings have. Our guide on what triggers a commercial insulation retrofit explains the code review. Still in production? Read about industrial thermal insulation for pipes and equipment. Pick your plan to see what changes.
Stays industrial
What usually changes
- Same use, so the energy code mostly applies to the parts you alter
- A roof replacement can bring roof insulation up to current values
Insulation focus
- Roof deck and walls for comfort and condensation
- Old insulation out first
- Thermal barrier over any foam
Still a working plant? Our manufacturing plant page covers insulating around production.
Designated historic buildings can be exempt from parts of the energy code when a report is filed with the code official. A change of use that raises energy demand is generally held to the current code. In Denver, the energy code is based on the 2021 IECC with local amendments, and Denver's building and fire codes on the 2024 I-codes. Your architect and Denver Community Planning and Development confirm what applies.
Your plan
Sketch the order of work for your factory
Answer what you know and skip what you don’t. The draft list puts the work in the order an older factory usually needs it. It is a draft for the walk-through, not a recommendation.
Sheet A-1Draft order of work0 of 5 answered
- Pick an answer on the left and the steps appear here.
Built only from your answers. Testing, the masonry check and your design team can change the order.
Cost
What drives factory insulation cost
Older buildings carry more unknowns, so pricing leans on what we find. These are the things that move the number on a Denver factory job, and the factory file that cuts the unknowns down before your estimate.
- What has to come outOld insulation, ceilings and finishes.
- Test resultsAbatement changes the order and timing of work.
- Wall type and conditionBrick, block or concrete, and any repairs first.
- Roof timingAbove the deck at reroof, or below it now.
- Planned useOffices and lofts need more finish and sound work.
- AccessCeiling height, machinery and occupied areas.
Archive boxYour factory file
Tick what you have. When you open the estimate form it appears in your request, and you can remove it there.
What your estimate lists
- Areas and measured surfaces
- Wall and roof methods
- Removal of old insulation
- Order of work around testing
- Access around machinery or tenants
- Exclusions such as abatement and masonry repair
We do not publish per-square-foot prices for Denver factories, because what comes out, the wall condition and roof timing change the number. Your estimate is built from the walk-through. Our Colorado insulation rebates page explains how utility rebates and tax credits work.
Related services
Other Grizzly Insulation services for Denver industrial buildings
Service area
Serving Denver factories from Commerce City
Grizzly Insulation is a factory insulation contractor at 7140 Ivy St in Commerce City, just north of Denver, working on older factories and conversions across the metro. We also handle manufacturing plant insulation in Denver, Denver industrial plant insulation and machine shop insulation in Denver.
- Denver~7 mi
- Commerce City~1 mi
- Thornton~4 mi
- Federal Heights~4 mi
- Northglenn~6 mi
- Aurora~8 mi
- Brighton~12 mi
- Longmont~25 mi
- Loveland~40 mi
- Greeley~43 mi
- Fort Collins~53 mi
Approximate straight-line distance from our Commerce City base. Tap a city for its commercial insulation page.
Questions
Denver factory insulation FAQs
Site ledger
Do you need to see the factory before giving an estimate?
Yes. An accurate estimate needs the walk-through: we look at the walls, the roof deck, old insulation and any test results, then send a written scope letter with the order of work and line-item pricing. The walk-through is free.
What should I have ready when I ask for an estimate?
The building’s city or ZIP, roughly when it was built, a sentence on what you are seeing or planning and your rough timing. An asbestos or lead survey, roof age or drawings help but are optional.
Can our architect, builder or property manager request the estimate?
Yes. Tell us who the owner is and we will work with whoever runs the project. On conversions we work to the drawings and coordinate with the abatement firm, roofer and other trades.
How soon will we hear back?
We reply within 24 hours to confirm the details and set a walk-through time. Sending a request does not commit you to anything.
Do you work where our factory is?
We are based in Commerce City, just north of Denver, and serve Denver and the surrounding metro. Enter the building’s ZIP in the form or the service area check and we will confirm the location with you.
What does a factory insulation contractor do?
A factory insulation contractor insulates and air-seals the roof, walls and interior spaces of factory buildings. For older factories that also means working around test results for asbestos and lead, choosing wall methods that suit old brick, block or concrete, and timing roof insulation with a reroof. Grizzly Insulation also removes old, non-asbestos insulation before new insulation goes in.
Can you insulate old brick factory walls from the inside?
Sometimes, after a check. Insulating solid brick from the inside makes the outer brick colder and slower to dry, which raises the risk of freeze-thaw damage. Building science research recommends assessing the masonry, water exposure and embedded steel first. Many owners start with the roof and air sealing and handle brick walls once they have been assessed.
Do you remove asbestos?
No. Asbestos must be identified by a Colorado-certified asbestos building inspector, and regulated material is removed by a certified abatement contractor. We remove clean, non-asbestos insulation and install the new system once testing and any abatement are done.
Does an old factory need an asbestos inspection before insulation work?
If the work will disturb more than Colorado’s trigger amounts in a commercial building (260 linear feet of pipe, 160 square feet of other surfaces or a 55-gallon drum’s worth), Regulation 8 requires an inspection by a certified inspector first. Buildings put up after 12 Oct 1988 may qualify for an exception with documentation.
How do you insulate concrete block walls?
Two common ways: inject foam into the hollow cores, which keeps the wall’s look and adds some insulation, or insulate the inside face with rigid board or spray foam and add a finish, which adds much more. We check for cracks and moisture before choosing.
What changes when a factory becomes offices or lofts?
A change of use that raises energy demand is generally held to the current energy code, and residential units bring fire separation and sound rating rules between units. Insulation is planned with your architect so it fits those assemblies. Designated historic buildings can be exempt from parts of the energy code when a report is filed.
Should we insulate the roof now or wait for a reroof?
If the roof has only a few years left, insulation above the deck at reroof is often the better value, and replacing a roof with insulation above the deck generally means bringing it up to current values. If the roof has many years left, insulating from below now may make more sense. We look at both on the walk-through.
What insulation works best for an older Denver factory?
It depends on the walls and the roof deck. Denver’s cold nights, strong summer sun and frequent freeze-thaw swings mean the roof usually comes first, with insulation above the deck at reroof or closed-cell spray foam under metal decks. Brick walls get a masonry check before any interior insulation, because the outer brick gets colder and wetter once the inside is insulated. The walk-through confirms the method for your building.
Does Energize Denver apply to my factory?
It may. Energize Denver covers Denver commercial buildings of 5,000 sq ft and up, and larger buildings must benchmark their energy use every year. Manufacturing, agricultural and industrial buildings follow their own compliance path, and a factory converted to offices or apartments is treated by its new use, so check your building in the Energize Denver lookup tool. Insulating the roof and walls is one way to cut the energy an older building uses for heating.
How much does factory insulation cost in Denver?
Factory insulation cost depends on what has to come out first, test results, wall type and condition, roof timing, the planned use and access. We price it from a free walk-through with an itemized scope letter.
Prefer to just ask?
Call and talk to the crew that will actually work in your building.
Get started
Give your old factory a warm, dry second life
Request a free estimate for your Denver factory. We walk the building with you and your design team and send a scope letter with the order of work, wall and roof methods, R-values and line-item pricing.
1
You send the form
A few short fields. We reply within 24 hours.
2
We walk the factory
Walls, roof, old insulation and test results, with you and your design team.
3
You get a scope letter
Order of work, methods, R-values and line-item pricing. No pressure, no upsells.